Redco Twins and Four Seasons Apart-Hotel Complexes

Complete electrical design for both complexes, covering the power distribution and supply network as well as the low-current systems.

Client
Redco
Sector
Hospitality
Services
Engineering Design, Power Supply
apart-hotel complexes
2

Challenge

Two apart-hotel complexes, Twins and Four Seasons, needed a complete electrical design.

Approach

The design covered both the power distribution and supply network and the low-current systems.

Outcome

A full electrical design was delivered for both complexes.

Scope of work

  1. 01Power distribution and supply network design
  2. 02Low-current systems design